• Skip to main content
  • Skip to header right navigation
  • Skip to site footer

(801) 604-1901

info@ateamdemo.com

A Team Demolition

  • Residential
  • Dustless
  • Commercial
  • Checklist
  • Contact Us

Pre-Demolition Checklist

Before the heavy lifting begins, there are several critical steps homeowners must take to ensure a safe, legal, and efficient project. Use the checklist below to prepare—and remember, A-Team Demolition and Land Clearing is here to assist you with completing every requirement to ensure your demolition stays on track and stress-free.

1. Permits & Approvals

  • Obtain required demolition permits from you local municipality
  • Verify zoning compliance
  • Confirm HOA approvals (if applicable)
  • Notify adjacent property owners if required by local regulations
  • Ensure all inspections are scheduled (if required)

Our team can help guide you through this process if needed.

2. Hazardous Material Inspection

  • Asbestos inspection completed (if structure was built before 1980)
  • Lead-based paint assessment (if applicable)
  • Mold inspection (if needed)
  • Underground storage tank inspection (if applicable)
  • Hazardous materials professionally removed prior demolition

Proper abatement must be completed before demolition can legally begin.

3. Property Preparation

  • Remove all personal belongings from the structure
  • Remove vehicles, trailers, and equipment from the driveway and yard
  • Clear out sheds, garages, and outbuildings (if not included in demo scope)
  • Mark items to be salvaged (if applicable)
  • Remove or protect landscaping you wish to preserve
  • Secure pets and livestock away from the work zone

4. Documentation & Planning

  • Confirm scope of work with A-Team Demolition and Land Clearing
  • Confirm project timeline
  • Review and sign contract
  • Provide 50% down payment
  • Provide emergency contact information

5. Neighbor & Community Courtesy

  • Inform neighbors of upcoming demolition schedule
  • Discuss temporary noise, dust, and truck traffic expectations
  • Coordinate shared driveway or access issues (if applicable)

Final Confirmation Before Start Date

Before mobilization, please confirm:

  • Permits are approved and posted
  • Hazardous materials have been cleared
  • Site is accessible
  • Contract and payment terms are finalized

We’re Ready When You Are

At A-Team Demolition and Land Clearing, safety, compliance, and professionalism come first. Proper preparation ensures your demolition project starts on time and runs smoothly.

If you have questions about any step in this checklist, our team is here to help guide you through the process.

Contact Us

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

(801) 604-1901

info@ateamdemo.com

514 West 9460 South
Sandy, UT 84070

Mon – Fri 7:00 AM – 5:00 PM

© 2026 · A Team Demolition · Privacy Policy